黄色a级毛片,日日欧美,国产剧情精品,综合色桃花久久亚洲,香蕉网站男人网站,国产成人在线看,偷窥自拍亚洲色图

Today:
首頁 > English > News Gallery > Company Everts > Company News

Dongting Lake Bridge -- The First Pile Cap Cast Successfully

Source:    Date:2014-02-14  

Recently, the No.6 pile cap of the Dongting Lake Bridge of the key control project of Mengxi-Huazhong railway was cast successfully. This is the first pile cap of Dongtinghu Lake Bridge that was cast in-situ successfully, which provide a favorable opportunity for the foundation construction of the pier shaft.

The No.6 pile cap is in rectangular shape, of which the dimension is 24m×9.2m×3.5m. It was cast by layers with one pour of C40 concrete, the total volume of concrete is 773m3.

up:

next: